The Glass Bridge Construction of the Skywalk began March of 2004 and is
estimated to be completed by 4th quarter of 2006.
the very edge of the
conducted and the structure passed engineering requirements by 400
percent
747 airplanes (more that 71 million pounds).
The bridge will be able to sustain winds in excess of 100 miles per
hour from 8 different directions
earthquake within 50 miles. More than one million pounds of steel will
go into the construction of the Grand Canyon Skywalk.
No comments:
Post a Comment